Antony | How to obtain an item unit rate by applying a certain percentage increase or decrease to the unit rate of a different item either from the price list or the BoQAntony 2020-09-29 17:50:00 I would like to share the following support request Request How to obtain an item rate by applying a certain percentage to the unit rate of a different item either from the price list or the BoQ. Answer This can be obtained by using the 'surcharge in percent' function, and ' surcharge on BoQ items (Wall repairs) ', available on the price list editor -> Standard tab menu, --> see figure procedure: A) surcharge in percent, it allows to obtain the unit rate of a certain work item ( surcharge...)by applying a percentage to the unit rate of a different work item --> see figure Having calculated the price, this (surcharged...) work item must be moved from the price list editor to the measurement editor of the BoQ. Here, in the measurement row must be inserted the same measurement/quantity for which can be used the 'insert see item' function. --> see figure B) surcharge on BoQ items (Wall repairs), it allows to obtain a work item price (Wall repairs...) by applying a percentage to the item rate of one or more work items listed in the measurement editor. --> see figure Having calculated the price, this ( Wall repairs...) work item must be moved from the price list editor to the measurement editor of the BoQ. Here, in the eq. parts box of the measurement row must be inserted 1 in order to obtain the unit quantity. --> see figure |